Operator:
Stadtwerk Winterthur
Consultants:
Kurt Rothweiler
Wood firing system:
1.8 [MW]
Heat recovery:
approx. 460 [kW]
Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)
Commissioning:
June 2013
Products:
Flue gas condenser, K02
Wet electrostatic precipitator, N02
Water treatment system, W07
Big-Bag Handling system, S04