Executed projects - Heat recovery and wet flue gas cleaning, boiler load

 

Executed projects - Dry flue gas cleaning, boiler load

DESP

CH- Affoltern am Albis

Screen Shot 2016-07-09 at 00.17.56.png

Operator:
HEA Holzenergie AG

Consultants:
Durena AG

Wood firing system:
7 [MW] (5 [MW] / 2 [MW])

Heat recovery :  
approx. 1.1 [MW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Devaporization:
to -5 [°C]

Commissioning:
February 2013

Products:
Flue gas condenser, K07
Wet electrostatic precipitator, N07
Water treatment system, W07
Bypass- damper, B04
Big-Bag Handling system, S07
Devaporisor, E07

CH - Eischoll

Screen Shot 2016-07-09 at 00.15.35.png

Operator:
Eischoll Energie AG

Consultants:
Renercon Anlagen AG

Wood firing  system:
2 [MW]

Heat recovery:
approx. 300 [kW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
 January 2013

Products:
Flue gas condenser, K02
Wet electrostatic precipitator, N02
Water treatment system, W07
Bypass- damper, B02
Big-Bag Handling system, S04

CH- Tagelswangen

Screen Shot 2016-07-09 at 00.14.23.png

Operator:
HHE Heider Holzenergie AG

Wood firing system:
2 [MW]
                
Heat recovery:
approx. 380 [kW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
December 2013

Products:
Flue gas condenser, K02
Wet electrostatic precipitator, N02
Water treatment system, W07
Big-Bag Handling system, S04

CH - Bissau

Screen Shot 2016-07-09 at 00.12.59.png

Operator:
Wärmeverbund Bissau

Consultants:
NRG A AG

Wood firing system:
2.7 [MW] 

Heat recovery:
approx. 500 [kW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
January 2013

Products:
Flue gas condenser, K04
Wet electrostatic precipitator, N04
Water treatment system, W07
Big-Bag Handling system, S04

CH- Hedingen

Screen Shot 2016-07-09 at 00.11.45.png

Operator:
Wärmeverbund Hedingen

Consultants:
Renercon Anlagen AG

Wood firing system:
2.5 [MW]

Heat recovery:
approx. 480 [kW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
January 2013

Products:
Flue gas condenser, K02
Wet electrostatic precipitator, N04
Water treatment system, W07
Big-Bag Handling system, S04

CH- Zinzikon

Screen Shot 2016-07-09 at 00.10.30.png

Operator:
Stadtwerk Winterthur

Consultants:
Kurt Rothweiler

Wood firing system:
1.8 [MW]

Heat recovery:
approx. 460 [kW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
June 2013

Products:
Flue gas condenser, K02
Wet electrostatic precipitator, N02
Water treatment system, W07
Big-Bag Handling system, S04

CH- Wittenbach

Screen Shot 2016-07-09 at 00.06.43.png

Operator:
SAK AG

Consultants:
Hälg & Co. AG

Wood firing system:
5.8 [MW]

Heat recovery:
approx. 1.1 [MW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
March 2014

Products:
Flue gas condenser, K07
Wet electrostatic precipitator, N07
Water treatment system, W07
Bypass- damper, B04
Big-Bag Handling system, S07

AT- Rauris

Screen Shot 2016-07-09 at 00.05.11.png

Operator:
Hackschnitzel und Heizgenossenschaft Rauris reg.GenmbH

Consultants:
SEEGEN

Wood firing system:
5.2 [MW] (2.2 [MW] / 3.0 [MW])

Heat recovery:
approx. 1.5 [MW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Devaporization:
to -5 [°C]

Commissioning:
July 2014

Products:
Flue gas condenser, K07
Wet electrostatic precipitator, N07
Water treatment system, W07
Bypass- damper, B04
Big-Bag Handling system, S07
Devaporisor, E07

CH- Hettlingen

Screen Shot 2016-07-09 at 00.03.44.png

Operator:
Politische Gemeinde Hettlingen

Consultants:
Müller + Pletscher AG

Wood firing system:
1.6 [MW]

Heat recovery:
approx. 400 [kW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
April 2014

Products:
Flue gas condenser, K02
Wet electrostatic precipitator, N02
Water treatment system, W07
Bypass- damper, B02
Big-Bag Handling system, S04

CH- Schüpfen

Screen Shot 2016-07-09 at 00.02.21.png

Operator:
Wärmeverbund Lyssbach Schüpfen AG

Consultants:
a energie AG

Wood firing system:
2.2 [MW]

Heat recovery:
approx. 400 [kW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
March 2014

Products:
Flue gas condenser, K02
Wet electrostatic precipitator, N02
Water treatment system, W07
Bypass- damper, B02

SE- Bjuv

Screen Shot 2016-07-09 at 00.00.52.png

Operator:
Neova AB

Consultants:
Hotab Group AB

Wood firing system:
3 [MW]

Heat recovery:
approx. 600 [kW]

Dust content:
< 100 [mg/Nm3] (at 6 vol-% O2)

Commissioning:
November 2013

Products:
Flue gas condenser, K04
Water treatment system, W07
Bypass- damper, B04
Big-Bag Handling system, S07

PL- Stelmet

Screen Shot 2016-07-08 at 23.59.42.png

Operator:
Stelmet sp. z o.o. S.K.A.

Consultants:
IS SaveEnergy AG

Wood firing system:
10 [MW]

Heat recovery:
approx. 4 [MW]

Commissioning:
November 2013

Products:
Flue gas condenser, K11
Water treatment system, W11
Big-Bag Handling system, S04

CH- Stadtspital-Triemli

Screen Shot 2016-07-08 at 23.58.04.png

Operator:
EWZ

Consultants:
Gruner Gruneko AG

Wood firing system:
2.6 [MW]

Heat recovery:
approx. 800 [KW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
September 2014

Products:
Flue gas condenser, K04
Wet electrostatic precipitator, N04
Water treatment system, W04
Bypass- damper, B02
Big-Bag Handling system, S04

CH- Ibach

Screen Shot 2016-07-08 at 23.56.27.png

Operator:
AGRO Energie Schwyz AG

Consultants:
erwin betschart energie + haustechnik

Wood firing system:
9.7 [MW] (3.2 [MW] / 6.5 [MW])

Heat recovery:
approx. 1.8 [MW]

Dust content:
< 10 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
October 2014

Products:
Flue gas condenser, K11
Wet electrostatic precipitator, N11
Water treatment system, W11
Big-Bag Handling system, S07

CH- Elgg

Screen Shot 2016-07-08 at 23.54.36.png

Operator:
Gemeinde Elgg

Consultants:
Hälg & Co. AG

Wood firing system:
2.4 [MW]

Heat recovery:
approx. 350 [KW]

Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)

Commissioning:
October 2014

Products:
Flue gas condenser, K04
Wet electrostatic precipitator, N04
Water treatment system, W07
Big-Bag Handling system, S04

LV- Jaunolaine

Screen Shot 2016-07-08 at 23.52.37.png

General 
Contractor:
SIA  LER Baltic Group

Wood firing system:
3 [MW]

Heat recovery:
approx. 800 [KW]

Dust content:
< 80 [mg/Nm3] (at 6 vol-% O2)

Commissioning:
December 2014

Products:
Flue gas condenser, K04
Wet electrostatic precipitator, N02
Water treatment system, W07
Bypass- damper, B04