Operator:
Wärmeverbund Hedingen
Consultants:
Renercon Anlagen AG
Wood firing system:
2.5 [MW]
Heat recovery:
approx. 480 [kW]
Dust content:
< 20 [mg/Nm3] (at 11 vol-% O2)
Commissioning:
January 2013
Products:
Flue gas condenser, K02
Wet electrostatic precipitator, N04
Water treatment system, W07
Big-Bag Handling system, S04