Operator:
DH Mals
Wood firing system:
4.2 + 2.0 [MW]
Cleaning:
89 %, 180 mg/Nm3 (11% O2), 20 mg/Nm3 (11% O2)
Commissioning:
10/2015
Products:
ESP D07
Flaps for operation with boiler 1, 2 or in parallel high voltage unit for max. 50 °C